Colorado owned since 1995

Text 970.928.0655

Service

Multi-Story Stocking

Material distributed floor by floor, staged where the crew starts, not piled at the loading dock.

OUTWEST1995

Five Colorado yards.
One outfit.

01

The work we do most of

Large condominium and hospitality projects in Telluride, Vail, and Aspen. Multi-story residential over structured parking, hotel and lodge renovations working around an operating season, and the mixed-use buildings going up in every resort town on our map. These are commercial jobs with a GC, a schedule, and a submittal log — and they are the jobs our fleet and our five-yard footprint were built for.

A resort job has constraints a flatland job does not: a delivery window measured in hours, a single hoist shared by four trades, a finished lobby the material has to cross, and an owner who will not close the property. We plan around those rather than showing up and discovering them.

02

How it works

We take the load in through the elevator or the hoist and set it on each floor to your plan. You tell us the sequence and how much per level; we work to it.

03

What we need

  • Elevator or hoist availability and the window we can use it
  • Weight limits and cab dimensions
  • Which floors, in what order, and how much on each
  • Protection requirements from the GC
04

Why bother

Because on a five-story job the difference between board on the dock and board on the floor is a full day of a crew moving material instead of installing it. On a tight schedule that day is the schedule.

The branch makes the call

Send the list.
We check the load.

Text your order →Find your branch